Head inside the library and you should see two fugitives killed by a sniper - Get through the library - Act 2 - Ghost of Sarajevo - Sniper: Ghost Warrior 2 - Game Guide and Walkthrough

Head inside the library and you should see two fugitives killed by a sniper. Welcome to sniper alley. The first sniper is very well visible, as he's wearing a blue jacket [290m] and can be found in the right side of the building, in the distance.

SECRET 2/4 - On the table on the right, in the first room of the library.

Very slowly move onwards, turning into the room on the left - Get through the library - Act 2 - Ghost of Sarajevo - Sniper: Ghost Warrior 2 - Game Guide and Walkthrough

Very slowly move onwards, turning into the room on the left. The next sniper can be killed through the first window on the right from the room entrance. He's in the window on the right, by the balcony [220m]. You can also get through this part by running across the room to avoid fire or crawling till the very end.

The third sniper is lurking on the balcony at the end of the left side of the building - hide yourself between the shelves so that he has a hard time location you [210m] - Get through the library - Act 2 - Ghost of Sarajevo - Sniper: Ghost Warrior 2 - Game Guide and Walkthrough

The third sniper is lurking on the balcony at the end of the left side of the building - hide yourself between the shelves so that he has a hard time location you [210m].

You will reach a room which will be entered by a big group of soldiers - Get through the library - Act 2 - Ghost of Sarajevo - Sniper: Ghost Warrior 2 - Game Guide and Walkthrough

You will reach a room which will be entered by a big group of soldiers. Wait for some of them to go up the stairs and eliminate them first. After clearing the area completely, move onwards while looking out for two more enemies who will appear.

Sniper: Ghost Warrior 2

March 12, 2013

PC PlayStation Xbox Nintendo
Rate It!

You are not permitted to copy any image, text or info from this page. This site is not associated with and/or endorsed by the developers and the publishers. All logos and images are copyrighted by their respective owners.

Copyright © 2000 - 2026 Webedia Polska SA for gamepressure.com, unofficial game guides, walkthroughs, secrets, game tips, maps & strategies for top games.