Assassins Creed Valhalla: How to get Skadi's Hobby trophy?

This trophy guide page for AC Valhalla contains a description of the achievement Skadi's Hobby. This trophy is awarded for completing over 150 meters of sliding on snow.

Guides

Last update:

Download Guide
Table of Contents
Download Guide

On this page of Assassin's Creed Valhalla's trophy guide, you will learn how to unlock theSkadi's Hobby trophy. This achievement is awarded for performing a 150-metre long slide on snow.

You can earn this trophy in the first hours of the game, because the opportunity to unlock it appears in the "starting" region of Rygjafylke in Norway - Assassins Creed Valhalla: How to get Skadis Hobby trophy? - Trophy guide - Assassins Creed Valhalla Guide and Walkthrough

You can earn this trophy in the first hours of the game, because the opportunity to unlock it appears in the "starting" region of Rygjafylke in Norway. Specifically, move to the Fannaraki Summit vantage point marked in the image.

The slide is made a few dozen meters to the southeast from the top of the mountain - this area is marked on the picture - Assassins Creed Valhalla: How to get Skadis Hobby trophy? - Trophy guide - Assassins Creed Valhalla Guide and Walkthrough

The slide is made a few dozen meters to the southeast from the top of the mountain - this area is marked on the picture.

The place where the slide starts is shown in the picture above - Assassins Creed Valhalla: How to get Skadis Hobby trophy? - Trophy guide - Assassins Creed Valhalla Guide and Walkthrough

The place where the slide starts is shown in the picture above. Save the game before you start the slide. This will allow you to easily repeat the attempt in case you fail.

You have to ride down slalom-like and avoid a small hill because in these places Eivor can clearly slow down and interrupt the slide prematurely - Assassins Creed Valhalla: How to get Skadis Hobby trophy? - Trophy guide - Assassins Creed Valhalla Guide and Walkthrough

You have to ride down slalom-like and avoid a small hill because in these places Eivor can clearly slow down and interrupt the slide prematurely.

If you have done everything as planned, the trophy will be unlocked just after the end of the slide - Assassins Creed Valhalla: How to get Skadis Hobby trophy? - Trophy guide - Assassins Creed Valhalla Guide and Walkthrough

If you have done everything as planned, the trophy will be unlocked just after the end of the slide.

Assassin's Creed: Valhalla

November 10, 2020

PC PlayStation Xbox
Rate It!

You are not permitted to copy any image, text or info from this page. This site is not associated with and/or endorsed by the developers and the publishers. All logos and images are copyrighted by their respective owners.

Copyright © 2000 - 2026 Webedia Polska SA for gamepressure.com, unofficial game guides, walkthroughs, secrets, game tips, maps & strategies for top games.